Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

258 Wakesleigh Road, Bellair, Durban

HeritageAuthority: 

PermitID: 

3409

PermitHolder: 

PermitDate: 

Wednesday, December 29, 2021 to Sunday, December 29, 2024

NHRA: 

KZNHA: 

Conditions: 

This permit is issued subject to the following conditions:-

1.1           That the work is carried out strictly in accordance with the application submitted on the 26 January 2021 and additional information received on the 12 November 2021, and in accordance with M.N. ARCHITECTURAL DESIGNS (M. Narrandes) drawing no.:  WR-IH-01 , WR-IH-02 , WR-IH-03 , WR-IH-04 , WR-IH-05 , WR-IH-06 , WR-IH-07 , DATED: 20/10/2020 and LINDSAY NAPIER ARCHITECT drawings 18-26 RR01, 02, 03, 04, 05, 06,  &  07, DATED: 2021/11/12, and that the work on the existing buildings runs concurrently with the new buildings on site;

1.2           That in the event of any contemplated deviation, the prior written approval of the KwaZulu-Natal Amafa and Research Institute must be obtained;

1.3           In such event, a written motivation in support of such deviation must be submitted to KwaZulu-Natal Amafa and Research Institute for consideration and;

1.4           The KwaZulu-Natal Amafa and Research Institute has the right to inspect the site at any time; 

1.5           That all specifications and details for work on the existing buildings and landscaping of the site are cleared before work is undertaken and that the work on the existing buildings is overseen by the Heritage Specialist and specialist Structural Engineer, who must submit monthly reports to the KwaZulu-Natal Amafa and Research Institute on the work being conducted;

1.6           A final report on the work conducted and the findings must be submitted  by the Heritage Specialist to the KwaZulu-Natal Amafa and Research Institute not later than thirty (30) days from the date of practical completion of both the new buildings and the work on the existing buildings, extensions are negotiable;

1.7           Compliance for the new buildings shall not be achieved until the work on the existing buildings has reached practical completion;   
   
1.8         All salvageable material not required for re-use on the site must be offered to the KwaZulu-Natal Amafa and Research Institute and selected material must be delivered to the repository at Midmar at the applicant’s cost;

1.9           Upon discovery, all archaeological and paleontological material becomes the property of the Province of KwaZulu-Natal and must be lodged at the repository the KwaZulu-Natal Amafa and Research Institute.

1.10           It is the responsibility of the Applicant to ensure that artefacts are preserved in their original state while in his/her possession;

1.11         The Applicant shall be liable for any damage or destruction caused at any site or to any artefact.

1.12         The KwaZulu-Natal Amafa and Research Institute shall not be liable for any loss, damage or injuries to any person/s or property caused by any of the activities conducted by the applicant;

1.13         That a copy of this permit is kept on the premises at all times during construction work;

1.14         FAILURE TO COMPLY WITH THESE CONDITIONS WILL RENDER ANY ACTIVITY CONDUCTED UNLAWFUL, AND THE KWAZULU-NATAL AMAFA AND RESEARCH INSTITUTE RESERVES THE RIGHT TO CANCEL THIS PERMIT AND TO INSTITUTE CRIMINAL AND/OR CIVIL ACTION AGAINST THE PERSON/S RESPONSIBLE.

1.15         The issuing of this permit does not exempt the Applicant from compliance with any other law, where applicable.

PermitFeePaidDate: 

29/12/2021

PDF of Permit: 

AttachmentSize
PDF icon 258 Wakesleigh Road permit.pdf123.28 KB
 
 