Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

archaeological mitigation for the du plessis dam pv1 sef, de aar

HeritageAuthority: 

PermitID: 

3431

PermitHolder: 

PermitDate: 

Thursday, February 10, 2022 to Friday, February 24, 2023

NHRA: 

Activities: 

Conditions: 

This permit is issued to Jayson Orton (ASHA Consulting (Pty) Ltd) for mitigation of two Later Stone Age archaeological and one Historical Site to be impacted by the Du Plessis Dam PV Solar energy Facility, De Aar, Northern Cape.

1. If the permit holder is not to be present on the site at all times then SAHRA must be provided with the names and qualifications of the authorised representatives.

2. Excavation methods include establishment of a grid for surface collection and the use of trowls and dustpans and sieving if necessary. All collected material must be mapped in situ using GPS or total station.

3. Adequate recording methods as specified in the Regulations and Guidelines pertaining to the National Heritage Resources Act must be employed. Note that the position of all excavations and objects collected must be marked on a plan of the site.

4. A standard site record form must be lodged with the McGregor Museum, Kimberley.

5. All material collected and excavated, as well as field notes and records, will be curated by the McGregor Museum, Kimberley, who will be responsible for the permanent curation and safekeeping of all artefactual material in a condition that allows ongoing research.

6. A final report on the results of the mitigation and analyses must be emailed to apmpermitreports@sahra.org.za on or before 24 February 2023 using the template in the following link: https://sahris.sahra.org.za/content/apmpermitreports. SAHRA reserves the right to withhold further permits if progress is not deemed satisfactory. Permit reports can be made available to researchers on request within three years of the lapsing of this permit.

7. Reprints of all published papers or copies of theses and/or reports resulting from this work must be lodged with SAHRA.

8. It is the responsibility of the permit holder to obtain permission from the landowner for each visit, and the excavator is responsible for ensuring that he or she has an understanding with the landowner concerning: the number of visitors and workers; conditions for camping on the property; speed limits on access roads; possible prohibitions on off-road driving; size, type and number of vehicles permitted; possible prohibitions on trespassing beyond the site; disturbing fauna, flora or substrate; erection and demolition of structures on the site; appropriate hours of visiting and working on the site; use of firewood, electricity and water; lighting fires and the prevention of uncontrolled fires and any fencing necessary to protect livestock. Conditions of access imposed by the landowner must be observed.

9. The permitted excavator shall be responsible for the activities and impacts of all colleagues, students and employees under his or her supervision.

10. Excavators must take measures to ensure the safety of any person who may enter the excavation site as part of their excavation team or as their visitor.

11. It is the responsibility of the permit holder to protect sites during and after excavation and to ensure that, where appropriate, excavations are filled in or stabilised with adequate materials (e.g. Loffelstein blocks or army bags in geotextile) to the satisfaction of SAHRA and the landowner.

12. SAHRA shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.

13. SAHRA reserves the right to cancel this permit by notice to the permit holder.

14. This permit is subject to a general appeal and may be suspended should an appeal against the decisions be received by SAHRA within 14 days from the date of the permit. SAHRA may not be held responsible for any costs or losses incurred in the event of the suspension or retraction of this permit.

15. Request to renew permits must be done at least two months prior to the expiry of the existing permit.

PermitFeePaidDate: 