The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

HAKSKEEN PAN EVENTS AND TOURISM-RELATED DEVELOPMENT Including the Bloodhound SSC, Speed Events and other tourism-related eventsHAKSKEEN PAN EVENTS AND TOURISM-RELATED DEVELOPMENT Including the Bloodhound SSC, Speed Events and other tourism-related events

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The intention is to develop Hakskeen Pan as a multi-event outdoor arena/stadium type facility which could host future events such as land speed record attempts (Bloodhound SSC), speed testing, concerts and festivals etc. Approximately 16 150ha will be rezoned to accommodate the mixed use tourism-related area. Although the Basic Assessment Report and the Environmental Management Programme have been compiled with focus on the speed events (Bloodhound SSC), the general recommendations and mitigation measures outlined in the BAR, specialist reports and the EMP should be adopted by any other future events. The construction of infrastructure for the speed events held/to be held on Hakskeen Pan has commenced. The infrastructure constructed to date includes the following and is included in a separate Section 24G Application under the NEMA EIA Regulations 2010: - a 20km long, 500m wide track has been constructed, including a 300m wide safety buffer on either side of the track. Construction comprises of the following:  317 workers have cleared by hand an area of 20km x 1,1km of all surface stones and pebbles.  Rehabilitation of the pan in the form of removing an existing causeway which was previously the main road between Mier and Rietfontein has taken place. This road which was 1m high was removed and the pan restored to its original surface and level.  Material removed from the road was placed back in the borrow pits created many years ago when this road was first built.  In certain areas it was necessary to remove stones which protruded above the surface but which extended to below the surface of the pan. These cases only represent a total estimated area of 500m x 300m when combined thus only 0,68% of the total amount of stones removed unearthed by machines, the rest was removed by hand.  The only place where grading has and will take place is to repair manmade indentations and elevations in the form of old tracks created by locals or in the case of the elevated causeway which was removed. - Temporary structures (mostly shipping containers) placed on the edge of the pan for various functions such as control, storage, hospitality, showers and toilets etc.) located at the landside/Speedweek camp. - A 110kVa diesel generator, with a 3500l diesel tank and bund, also housed within a portable shipping container on site. - Two telecommunications masts placed at the landside camp and next to the R31 - 6 x 10 000l jo-jo tanks have been constructed for the storage of water on site. - Water is sourced from local borehole near the site, via a 16m long, 40mm diameter pipeline. - There is also a 110kVa diesel generator, with a 3500l diesel tank and bund, also housed within a portable shipping container on site. - A 44000l sewerage septic/holding tank has also been constructed at the landside/ Speedweek camp for the temporary storage of all effluent. The tank is emptied by a honeysucker by the local Municipality when it is full. At this stage it is not known what additional infrastructure (conservancy tanks etc.) - Farm boundary fencing was also moved to accommodate the track - There was also a 7km, 500m wide track for the speedweek events, however, no preparation of this track was required. The following infrastructure and development still needs to take place, and is the subject to this NEMA

ApplicationDate: 

Friday, February 10, 2017 - 13:00

CaseID: 

10668

OtherReferences: 

ReferenceList: 

AdditionalDocuments
  1. File Draft BAR - I&APs.docx
  2. PDF icon Cover page and Executive Summary - NEMA Application.pdf
  3. PDF icon Hakskeenpan - Draft BAR - NEMA Application.pdf
  4. PDF icon Appendix A1 - Locality Map.pdf
  5. PDF icon Appendix A2 - Proposed Rezoning Area.pdf
  6. PDF icon Appendix A3 - Detailed Land uses.pdf
  7. PDF icon Appendix B - Site overview photos Final.pdf
  8. PDF icon Appendix D1 - Bloodhound Integrated Development Strategy.pdf
  9. PDF icon Appendix D2 - Socio-economic Impact Assessment.pdf
  10. PDF icon Appendix D3 - Hakskeenpan Wetland Hydropedology Impact and Management Report.pdf
  11. PDF icon Appendix D4 - Freshwater Assessment.pdf
  12. PDF icon Appendix D5 - Heritage Impact Assessment.pdf
  13. PDF icon Appendix D6 - Flora Assessment.PDF
  14. PDF icon Appendix D7 - Fauna Assessment.PDF
  15. PDF icon Appendix D8 - Bulk Engineering Services report.pdf
  16. Image icon Appendix E1 - Proof of Newspaper advert.jpg
  17. PDF icon Appendix E1 - Proof of posters.pdf
  18. PDF icon Appendix E2 - Proof of email notifications.pdf
  19. PDF icon Appendix E2 - Proof of posted letters.pdf
  20. PDF icon Appendix E3 - Public Participation Report - Initial (Draft).pdf
  21. PDF icon Appendix E4 - Attendance list - public meetings.pdf
  22. PDF icon Appendix F - Impact assessment.pdf
  23. PDF icon Appendix G - Environmental Management Plan.pdf
  24. PDF icon Hakskeenpan - Post Application BAR - NEMA Application.pdf
  25. PDF icon Appendix A1 - Locality Map.pdf
  26. PDF icon Appendix A2 - Proposed Rezoning Area.pdf
  27. PDF icon Appendix A3 - Detailed Land uses.pdf
  28. PDF icon Appendix A4 - Site Development Plan.pdf
  29. PDF icon Appendix B - Site overview photos Final.pdf
  30. PDF icon Appendix D1 - Bloodhound Integrated Development Strategy.pdf
  31. PDF icon Appendix D2 - Socio-economic Impact Assessment.pdf
  32. PDF icon Appendix D3 - Hakskeenpan Wetland Hydropedology Impact and Management Report.pdf
  33. PDF icon Appendix D4 - Fresh Water Report V1.2.pdf
  34. PDF icon Appendix D4 - Freshwater Assessment.pdf
  35. PDF icon Appendix D5 - Heritage Impact Assessment.pdf
  36. PDF icon Appendix D6 - Palaeontological Impact Assessment.pdf
  37. PDF icon Appendix D7 - Flora Assessment.PDF
  38. PDF icon Appendix D8 - Fauna Assessment.PDF
  39. PDF icon Appendix D9 - Bulk Services Engineering Report.pdf
  40. Image icon Appendix E1 - Proof of Newspaper advert.jpg
  41. PDF icon Appendix E1 - Proof of posters.pdf
  42. PDF icon Appendix E2 - Proof of Draft BAR notifications.pdf
  43. PDF icon Appendix E2 - Proof of email notifications.pdf
  44. PDF icon Appendix E2 - Proof of posted letters.pdf
  45. PDF icon Appendix E3 - Public Participation Report - Initial (Draft).pdf
  46. PDF icon Appendix E4 - Attendance list - public meetings.pdf
  47. PDF icon Appendix E5 - Comment and Response Report.pdf
  48. PDF icon Appendix E5 - SAHRA - Interim Comment 1.pdf
  49. PDF icon Appendix E5 - SAHRA - Interim Comment 2.pdf
  50. PDF icon Appendix F - Impact assessment.pdf
  51. PDF icon Appendix G - Environmental Management Plan.pdf
 
 

Search form