Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

POST APPLICATION BASIC ASSESSMENT REPORT: SOLAR PHOTOVOLTAIC FACILITY – MOUNT ROPER (DEA Reference: 14/12/16/3/3/1/1753)

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Project Location and Description The proposed development site is located at 28°19' 06’’S, 24°13' 31’’E, 30km on the R31 road northwest of Kuruman. The proposed development is an array of 18540 crystalline solar photovoltaic (PV) modules grouped into tables or panels of 20 modules each. It is proposed that the PV tables would form an array covering an area of 20ha, circumscribed with a perimeter fire access road and fence. The PV tables will be raised approximately 500mm above ground level and will have single axis tracking systems allowing the generation of approximately 5MW of alternating current. Proposed associated infrastructure includes a fenced construction staging area, a maintenance shed, three inverter-transformer stations on concrete pads and two office buildings all on the 20ha site, as well as a switch panel and 1,9km of 22kV overhead powerline from the southern section of the PV array for connection to the power grid, at Eskom’s Riries substation north of the proposed development site, on the opposite side of the R31.

ApplicationDate: 

Tuesday, June 20, 2017 - 15:03

CaseID: 

11227

OtherReferences: 

ReferenceList: 

 
 

Search form