Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Proposed construction and operation of a new cementitious plant located on Portion 192 of Farm Daggafontein 125, Springs

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The applicant, Opsibuzz (Pty) Ltd proposes the construction and operation of a new cementitious plant located on Portion 192 of Farm Daggafontein 125, Springs, Johannesburg, City of Ekurhuleni local Municipality (Ward 76). The site extends over 4.2 hectares and will have a design capacity of 1,314,000 tons per annum, the facility will include the following: A grinding facility inclusive of a vertical roller mill that will operate at 150tph A blending Plant 50 000-ton Raw material Storage Facility 4 x mill hoppers (2 x 600 ton and 2 x 300 ton) 6 x cement silos (2000 ton) 1 x fly ash silo (1500 ton) Laboratory Workshop, Cooling Tower, Weighbridges, General buildings, Bagging and Palletising Shed, and A pollution control dam if necessary Process description: Raw Material handling – Raw materials are received via road and ship and stockpiled in the shed. Raw materials include Clinker, GBFS, Limestone and Gypsum. The plant will not produce clinker. Clinker is to be purchased from an external source and then crushed at the facility. The variation in the grades of cement is based on the mixing of clinker in different proportions with extenders such as slag, fly ash, limestone, etc. The main extender in our process is Granulated Blast Furnace Slag (GBFS) which is a non-hazardous by-product sourced locally from the steel making industry. Materials are to be transferred to the milling / drying area via a conveyor system. Cement milling / drying – Materials are extracted from their respective feed bins using weigh feeders. The weights are proportioned according to the pre-programmed recipes. Larger particles of GBFS are separated by use of a belt magnet and metal detectors which is removed for recycling. The grinding system employed by Cemza is among the most modern and energy efficient vertical roller mills. Materials are grinded in the mill via a rotary feeder Water and grinding aid is dosed into the mills in accurate dosages. The ground material is passed through the classifier via the hot gas generator. Partially ground material is trapped as it passes through the classifier – these particles are recycled through the mill. The ground product in powder form is the final product. Cement storage – Product is separated via a baghouse filter system. The product from the filters is lifted to the product storage silos by bucket elevator, air slide and distributor system and material is conveyed into the four storage silos. Packaging and palletising – Product is extracted from the silos and is packed with an automated dual packer and palletiser configuration.

ApplicationDate: 

Tuesday, April 26, 2022 - 16:49

CaseID: 

18453

OtherReferences: 

ReferenceList: 

 
 

Search form