Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Basic Assessment for the Proposed Construction and Operation of Electrical Grid Infrastructure to support the Sutherland, Sutherland 2 and Rietrug Wind Energy Facilities (WEFs), Northern and Western Cape Provinces

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The Project Applicant is proposing to develop a Major Transmission Substation (MTS) (400 m x 400 m); overhead 132 kV power line extending approximately 41 km in length from the authorised Sutherland Wind Energy Facility (WEF) on-site substation to the proposed MTS (this line has been assessed as part of three previous BA Processes); overhead 400 kV power line extending approximately 4 km in length from the proposed MTS connecting to an existing Eskom line; and service roads (jeep tracks) constructed below the power lines, with a 1.7 km deviation. The proposed project is required to provide the necessary electrical grid infrastructure to evacuate electricity generated by the proposed Sutherland, Sutherland 2 and Rietrug WEFs to the National Grid. The proposed project traverses various farm portions in the Northern and Western Cape and is located close to Sutherland.

ApplicationDate: 

Sunday, September 29, 2019 - 22:56

CaseID: 

14379

OtherReferences: 

DepartmentApplicationTypeDeadlineDate
04/11/2019

ReferenceList: 

 
 