Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

THE BASIC ENVIRONMENTAL IMPACT ASSESSMENT FOR THE UPGRADING OF EXISTING MAIN OUTFALL SEWER ON THE NORTHERN AREA (GRAVITY SEWER MAIN EVATON AND SEBOKENG NORTH TO WASTE WATER TREATMENT WORKS

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Based on the design the proposed bulk line is approximately 2.94km. The details of the proposed project is as follows: 1. Re-route all or most of the incoming outfall sewer with a new 1,5m diameter pipe around the village (see layout) and connect to existing parallel pipelines. a. Approximate length = 1150 b. Proposed Material: A combination of concrete and structured HDPe pipes. c. Anticipated length above ground = 750 d. Anticipated length underground = 400 e. Anticipated height above ground = 2.6m f. Anticipated max depth of excavation = 3.0m g. New manholes = 11 2. Due to the space available a small section of the existing line must be re-routed to provide space for the new parallel 1.8m diameter line. a. Length of deviation = 130 m with 3 new manholes b. Proposed Material: A combination of concrete and structured HDPe pipes. c. Length of new pipeline = 720 3. Due to possible capacity and elevation problems in future a new parallel line is also included alongside the 2 existing parallel lines. a. Length of new pipeline = 335 b. Proposed Material: A combination of concrete and structured HDPe pipes c. New manholes = 3 DESIGN CRITERIA Design Standards The design criteria are in accordance with the Guidelines for the provision of Engineering Services in Residential Townships and can be summarized as follows: Due to no clear design criteria being available for outfall sewers the following principals has been used for the preliminary design of the proposed outfall sewers. Actual design figures will be dealt with in the final detailed design report.

ApplicationDate: 

Tuesday, November 3, 2020 - 22:17