Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

PROPOSED AMENDMENT TO THE LICHTENBURG 1 PV FACILITY, NORTH WEST PROVINCE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The authorised ABO Wind Lichtenburg 1 PV solar energy facility (‘the project’) is located 12km north of Lichtenburg and 5.5km south of Bakerville in the North West Province. The project is located within Ward 16 of the Ditsobotla Local Municipality and the Ngaka Modiri Molema District Municipality in the North West Province. The development footprint of the solar energy facility is located on Portion 6 of Farm Zamenkomst No. 04 and the Remainder of Portion 4 of Farm Houthaaldoorns No. 2. It is within these properties that the project will be constructed and operated. The following infrastructure was authorised for the project by DFFE, as fully assessed within the Environmental Impact Assessment (EIA) process: Photovoltaic modules with a net generation (contracted) capacity of 100MW; On-site 88/132kV substation; Mounting structures (fixed tilt/static, single-axis or double-axis tracking systems) for the PV arrays and related foundations; DC/AC Inverters, LV/MV power transformers and internal electrical reticulation (underground cabling); A new 88/132kV overhead power line from the on-site substation to the Mmabatho / Watershed DS 1 88kV Power Line; Access and internal road network; Temporary laydown area; Auxiliary buildings (gate-house and security, control centre, office, two warehouses, canteen & visitors centre, rainwater tanks, etc); Perimeter fencing; and Battery Energy Storage System (BESS), with a capacity of up to 500MW/500MWh, an extent of no more than 5ha, and a maximum height of 3.5m1. The amendment being applied for through this process relates to the consideration of a part of the assessed Grid Connection Alternative 2 corridor as the preferred corridor in the Environmental Authorisation (EA2) for the project. This will allow the project to connect to the proposed step-up/on-site substation of ABO Wind Lichtenburg 3 PV on the authorised footprint of Lichtenburg 3 PV.

ApplicationDate: 

Friday, April 15, 2022 - 11:07

CaseID: 

18380

OtherReferences: 

ReferenceList: 

AdditionalDocuments
  1. PDF icon SE3390 0.Lichtenburg 1 PV Amendment 14.04.2022_Final.pdf
  2. PDF icon SE3390 Appendix A - Ecological Specialist Comment Letter .pdf
  3. PDF icon SE3390 Appendix B - Avifaunal Specialist Comment Letter.pdf
  4. PDF icon SE3390 Appendix D - Visual Specialist Comment Letter.pdf
  5. PDF icon SE3390 Appendix E - Public Participations Process Report.pdf
  6. PDF icon SE3390 Appendix F - A3 Maps.pdf
  7. PDF icon SE3390 Appendix G - EAP Declaration.pdf
  8. PDF icon SE3390 Appendix H - Consultant CVs.pdf
  9. PDF icon SE3350 App L - Public Participation Public.pdf
  10. PDF icon SE3350-L1 Amended EMPr Rev 1_July 2022.pdf
  11. PDF icon SE3350-L1 Appendix A - Maps.pdf
  12. PDF icon SE3350-L1 Appendix B - Grievance Mechanism.pdf
  13. PDF icon SE3350-L1 Appendix C - Open Space Management Plan.pdf
  14. PDF icon SE3350-L1 Appendix D - Revegetation & Rehabilitation Plan.pdf
  15. PDF icon SE3350-L1 Appendix E - Plant Rescue & Protection.pdf
  16. PDF icon SE3350-L1 Appendix F - Traffic Management Plan.pdf
  17. PDF icon SE3350-L1 Appendix G - Stormwater & Erosion.pdf
  18. PDF icon SE3350-L1 Appendix H - Waste Management Plan.pdf
  19. PDF icon SE3350-L1 Appendix I - Emergency Preparedness.pdf
  20. PDF icon SE3350-L1 Appendix J - CVs.pdf
  21. PDF icon SE3350-L1 Appendix K - Applicable Legislations Rev 1.pdf
  22. PDF icon SE3350-L1 Appendix M - EA and EA Amendments.pdf
  23. PDF icon SE3350-L1 Appendix N - Substation Generic EMPr.pdf
  24. PDF icon SE3350-L1 Appendix O - OHL Generic EMPr.pdf
  25. PDF icon SE3350-L1 Amended EMPr.pdf
  26. PDF icon SE3350-L1 Appendix A - Maps.pdf
  27. PDF icon SE3350-L1 Appendix B - Grievance Mechanism.pdf
  28. PDF icon SE3350-L1 Appendix C - Open Space Management Plan.pdf
  29. PDF icon SE3350-L1 Appendix D - Revegetation & Rehabilitation Plan.pdf
  30. PDF icon SE3350-L1 Appendix E - Plant Rescue & Protection.pdf
  31. PDF icon SE3350-L1 Appendix F - Traffic Management Plan.pdf
  32. PDF icon SE3350-L1 Appendix G - Stormwater & Erosion.pdf
  33. PDF icon SE3350-L1 Appendix H - Waste Management Plan.pdf
  34. PDF icon SE3350-L1 Appendix I - Emergency Preparedness.pdf
  35. PDF icon SE3350-L1 Appendix J - CVs.pdf
  36. PDF icon SE3350-L1 Appendix K - Applicable Legislations Rev 1.pdf
  37. PDF icon SE3350-L1 Appendix L - Public Participation Process Report.pdf
  38. PDF icon SE3350-L1 Appendix M - EA and EA Amendments.pdf
  39. PDF icon SE3350-L1 Appendix N - Generic EMPr Substation.pdf
  40. PDF icon SE3350-L1 Appendix O - Generic EMPr OHL.pdf
 
 

Search form