Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

AIA FOR THE PROPOSED TRANSNET HEYSTERKRAND RAILWAY LOOP PROJECT IN THE BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF RHENOSTERFONTEIN 86JQ FOR THE PROPOSED TRANSNET HEYSTERKRAND RAILWAY LOOP PROJECT IN THE BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE

Expanded_Motivation: 

The author was contracted to undertake a heritage assessment of proposed activities for the new Heysterkrand Railway Loop north of Rustenburg in order to identify possible areas of heritage sensitivity and constraints that would affect the development, and provide recommendations as to potential mitigation and management of such heritage receptors. The scope of the project includes the construction of the new loop of 1.4km along the railway line. The scope includes the construction of track work, required for doubling of the existing line. The loop is located on the railway network between Rustenburg and Thabazimbi. The loop construction will be undertaken within the Transnet servitude, however land will be acquired (lease agreement) for the purpose of stockpiling material and site camp establishment. A loop is a place on a railway line where trains travelling in opposite directions can pass each other. A loop is usually double ended and connected to the main track at both ends . Construction works for the project will include the following: - Civil Construction of a 1.4 kilometer long loop of 20t axle loading with formation layers according to the S410 specification for railway earthworks. The construction of the new loop will traverse through flat terrain between km points 159.55 to 160.95. - Perway The perway scope includes the 1,4km of track comprising of 6okg UIC60 rails on PY sleepers, 1:20 RH set at km 159.55 and a 1:20 LH set at km 160.95. - Signalling Install a localized remote control system to enable the Train Driver to remotely operate the 1:20 tangential point sets on both sides of the loop; The system uses a radio control to operate the both will be self-normalise and ML Track circuits to detect the train presence. - Structures There is one (1) box culvert which will be extended in order to accommodate the new loop. The culvert opening will be kept unchanged and the length of the culverts will be extended to suit the new loop line.

ApplicationDate: 

Friday, May 18, 2018 - 11:20

CaseID: 

12487

OtherReferences: 

ReferenceList: 

 
 

Search form