Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Camden I Wind Energy Facility 132 KV Grid Connection

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

ENERTRAG South Africa (Pty) Ltd (the Developer) is proposing the development of a Camden Renewable Energy Complex comprising various projects within the vicinity of the Camden Power Station in Mpumalanga. The Complex consists of eight projects referred to as: — Camden I Wind Energy Facility (up to 200MW) (subject to a Scoping and Environmental Impact Reporting (S&EIR) process) (DFFE Ref: 14/12/16/3/3/2/2137); — Camden, I Wind Grid Connection (up to 132kV) (subject to a Basic Assessment (BA) Process); (this application); — Camden Grid Connection and Collector substation (up to 400kV) (subject to a S&EIR process)(DFFE Ref: 14/12/16/3/3/2/2134); — Camden I Solar (up to 100MW) (subject to a S&EIR process)(DFFE Ref: 14/12/16/3/3/2/2136); — Camden I Solar Grid Connection (up to 132kV) (subject to a BA Process); — Camden II Wind Energy Facility (up to 200MW) (subject to a S&EIR process);(DFFE Ref: 14/12/16/3/3/2/2135); — Camden II Wind Energy Facility up to 132kV Grid Connection (subject to a BA Process); and — Camden Green Hydrogen and Ammonia Facility and associated infrastructure (subject to a S&EIR process)(MDARDLEA Ref: 1/3/1/16/1G-242) The proposed Camden I Wind Facility will be connected to the nearby Camden Collector substation (which in turn will connect to the Camden Power Station), through an up to 132kV powerline (either single or double circuit) between the grid connection substation portion (immediately adjacent the Camden I Wind Facility on-site IPP substation portion) and that of the Camden Collector substation. The focus of this Application is the proposed Camden I Wind Facility up to 132kV Grid Connection powerline and associated infrastructure. WSP Group Africa (Pty) Ltd (WSP) has been appointed by Enertrag as the independent Environmental Assessment Practitioner (EAP) to facilitate the Basic Assessment (BA) process in accordance with the Environmental Impact Assessment (EIA) Regulations (2014, as amended). The proposed project entails the construction of an up to 132kV Grid connection overhead powerline including associated infrastructure, from the Camden I Wind Facility to the nearby Camden Collector substation (which in turn will connect to the Camden Power Station). The lengths of the powerline alternatives are listed below, and is dependent on the authorized location of the collector substation: — Alternative 1: 3.9km (Preferred) (Preferred substation to Preferred collector) — Alternative 2: 5.69km — Alternative 3: 1.94km — Alternative 4: 1km The onsite grid connection substation will consist of high voltage substation yard to allow for multiple (up to) 132kV feeder bays and transformers, control building, telecommunication infrastructure, access roads, etc. The area for the onsite substation will be up to 1.5ha. The up to 132kV powerline and substation will have a 500m corridor (250m either side of the centre line and 250m around the entire perimeter of the proposed substation sites), to allow for micro-siting and avoidance of sensitive features where possible. This corridor, as opposed to the line routing, is proposed for authorisation. This application includes the necessary up to 132kV voltage electrical components required for connection at the Collector Substation (i.e., the termination works). The proposed project will comprise the following key components, detailed further in the table below: — The grid connection substation (adjacent the IPP substation), consisting of a high voltage substation yard to allow for multiple (up to) 132kV feeder bays and transformers, control building, telecommunication infrastructure, access roads, lighting and fencing; — Construction of an up to 132kV power line (either single or double circuit) between the grid connection substation portion and that of the Camden Collector substation; and — Termination works, comprising the necessary up to 132kV voltage electrical components required for connection at and into the Collector Substation. — Existing or new access and service roads (utilising existing roads where possible, with new roads developed where there are no existing roads to be utilised). — In order for the proposed project to proceed, it will require an Environmental Authorisation (EA) from the Competent Authority (CA) (i.e. the National Department of Forestry, Fisheries and Environment, (DFFE)).

ApplicationDate: 

Monday, April 3, 2023 - 17:01

CaseID: 

21034

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDateFinalDecision
14/12/16/3/3/1/2769
11/05/2023

ReferenceList: 

 
 

Search form