Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

PROPOSED DEVELOPMENT OF KOTULO TSATSI ENERGY PV 1 NEAR KENHARDT, NORTHERN CAPE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The Applicant, Kotulo Tsatsi Energy (Pty) Ltd, is proposing the construction of a photovoltaic (PV) solar energy facility (known as the Kotulo Tsatsi Energy PV1) located on a site located approximately 70km south-west of the town of Kenhardt and 60km northeast of Brandvlei in the Northern Cape Province. The solar energy facility will comprise several arrays of PV panels and associated infrastructure and will have a contracted capacity of up to 200MW. The facility will be located within the farm Portion 3 of Farm Styns Vley 280. The PV facility is planned to be located adjacent to the authorised 100MW Kotulo Tsatsi PV2 facility, and within an area previously authorised for CSP project infrastructure. The project site 1 falls under the Hantam Local Municipality which is part of Namakwa District Municipality. The site is accessible via an existing gravel farm road (known as Soafskolk Road) which provides access to the farm off of the R27 which is located east of the project site. The PV infrastructure assessed in this application is in response to the Applicant’s need to change the authorised generation technology for the facility located on the farm Portion 3 of Farm Styns Vley 280. That is, a technology change from the previously authorised CSP project infrastructure to PV project infrastructure. In this regard, the solar PV facility will be connected to the grid via a previously authorised grid connection solution 2, which consists of a collector substation, switching station and a power line to the Eskom Aries Substation located north-east of the project site. Kotulo Tsatsi Energy PV1 is planned to be bid into the Department of Mineral Resources and Energy’s (DMRE) Renewable Energy Independent Power Producer Procurement (REIPPP) Programme with the aim of evacuating the generated power into the national grid. This will aid in the diversification and stabilisation of the country’s electricity supply with Kotulo Tsatsi Energy PV1 set to inject up to 200MW AC into the national grid. A development envelope of ~847ha was defined through the Scoping evaluation of the site, and has now been assessed for the project which includes the PV infrastructure required to generate 200MW of electricity. The infrastructure to be developed within the development envelope will be known as the development footprint and will have an extent of ~810ha. The infrastructure associated with this PV development includes: » Solar PV array footprint comprising of: PV modules and mounting structures Inverters and transformers Integrated Energy Storage System (IESS) Cabling between the project components Internal access roads » Access roads, internal distribution roads and fencing around the development footprint » Admin block comprising of: Site offices and maintenance buildings, including workshop areas for maintenance and storage. Assembly plant Laydown areas The assessment of the PV facility on the site is to support the technology change from the previously authorised CSP project infrastructure to PV project infrastructure. In this regard, the following previously authorised infrastructure will be retained for use for the planned PV facility, and the associated footprint areas of the following previously authorised infrastructure have not been reassessed in this EIA: » Complete grid connection to Aries Substation: Grid connection via a previously authorised grid connection solution, which consists of internal grid reticulation, a collector substation, switching substation and a power line to the Eskom Aries Substation located north-east of the project site.

ApplicationDate: 

Wednesday, March 10, 2021 - 13:50

CaseID: 

16202

ReferenceList: 

AdditionalDocuments
  1. PDF icon KT PV1 App B - Auth. Correspondence.pdf
  2. PDF icon KT PV1 App C1 - I&AP Database.pdf
  3. PDF icon KT PV1 App C2 - Site Notice and Advertisements.pdf
  4. PDF icon KT PV1 App C3 - Background Information Document.pdf
  5. PDF icon KT PV1 App C4 - Organs of State Correspondence.pdf
  6. PDF icon KT PV1 App C5 - Stakeholder Correspondence.pdf
  7. PDF icon KT PV1 App C6 - Comments Received.pdf
  8. PDF icon KT PV1 App C7 - Minutes of Meetings.pdf
  9. PDF icon KT PV1 App C8 - Comments and Responses Report.pdf
  10. PDF icon KT PV1 App C9 - Public Participation Plan.pdf
  11. PDF icon KT PV1 App D - Ecology Impact Assessment.pdf
  12. PDF icon KT PV1 App E- Avifauna Impact Assessment.pdf
  13. PDF icon KT PV1 App F - Freshwater Impact Assessment.pdf
  14. PDF icon KT PV1 App G - Soils and Agriculture Potential Compliance Statement.pdf
  15. PDF icon KT PV1 App I - Visual Impact Assessment.pdf
  16. PDF icon KT PV1 App J - Social Impact Assessment.pdf
  17. PDF icon KT PV1 App K - SKA Clarification Statement.pdf
  18. PDF icon KT PV1 App L - EMPr.pdf
  19. PDF icon KT PV1 App M - EAP Affirmation & Declaration.pdf
  20. PDF icon KT PV1 App N - Specialist Declarations.pdf
  21. PDF icon KT PV1 App O - Maps (A3).pdf
  22. PDF icon KT PV1 App P - DEFF Screening Report.pdf
  23. PDF icon KT PV1-EIA Report (12.03.2021).pdf
  24. PDF icon 0.KT PV1 Final EIA Report. Final.pdf
  25. PDF icon KT PV1 App A - CVs.pdf
  26. PDF icon KT PV1 App B - Auth. Correspondence.pdf
  27. PDF icon KT PV1 App C1 - I&AP Database.pdf
  28. PDF icon KT PV1 App C2 - Site Notice and Advertisements.pdf
  29. PDF icon KT PV1 App C3 - Background Information Document.pdf
  30. PDF icon KT PV1 App C4 - Organs of State Correspondence.pdf
  31. PDF icon KT PV1 App C5 - Stakeholder Correspondence.pdf
  32. PDF icon KT PV1 App C6 - Comments Received.pdf
  33. PDF icon KT PV1 App C7 - Minutes of Meetings.pdf
  34. PDF icon KT PV1 App C8 - Comments and Responses Report.pdf
  35. PDF icon KT PV1 App C9 - Public Participation Plan.pdf
  36. PDF icon KT PV1 App D - Ecology Impact Assessment.pdf
  37. PDF icon KT PV1 App E- Avifauna Impact Assessment.pdf
  38. PDF icon KT PV1 App F - Freshwater Impact Assessment.pdf
  39. PDF icon KT PV1 App G - Soils and Agriculture Potential Compliance Statement.pdf
  40. PDF icon KT PV1 App I - Visual Impact Assessment.pdf
  41. PDF icon KT PV1 App J - Social Impact Assessment.pdf
  42. PDF icon KT PV1 App K - SKA Clarification Statement.pdf
  43. PDF icon KT PV1 App L - EMPr.pdf
  44. PDF icon KT PV1 App M - EAP Affirmation & Declaration.pdf
  45. PDF icon KT PV1 App N - Specialist Declarations.pdf
  46. PDF icon KT PV1 App O - Maps (A3).pdf
  47. PDF icon KT PV1 App P - DEFF Screening Report.pdf
  48. PDF icon KT PV1 App Q - Agreement of Water Supply.pdf
 
 

Search form