Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Proposed Coega Integrated Gas-to-Power Project: Gas Infrastructure

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Case Type: 

Development Type: 

ProposalDescription: 

The Coega Development Corporation (CDC) proposes to develop a gas to power project, including three power plants and associated infrastructure, within the Coega Special Economic Zone (SEZ). SRK Consulting (South Africa) (Pty) Ltd (SRK) has been appointed by CDC, as the independent environmental consultants to assess the environmental impacts of the proposed development according in terms of the National Environmental Management Act 107 of 1998 (NEMA) 2014 Environmental Impact Assessment (EIA) Regulations. The overall project would broadly involve the following components: • A Liquefied Natural Gas (LNG) terminal, consisting of a berth with off-loading arms within the Port of Ngqura, cryogenic pipelines, storage and handling facilities and re-gasification modules (both on and off-shore); • Gas pipelines and distribution hub, for the transmission, distribution and reticulation of natural gas within the Coega SEZ and Port of Ngqura; • Three Gas to Power plants, each with a 1000 MW generation capacity (specific generation technologies may vary); and • Electricity transmission connecting powerlines to evacuate electricity to the previously approved 400 kV lines in the SEZ

Expanded_Motivation: 

The proposed gas infrastructure will consist of all key supporting infrastructure required for the operation of the CDC’s proposed gas to power plants in the Coega SEZ. This will be made up specifically of infrastructure for the import, storage and transmission of LNG via the Port of Ngqura, to the various power plants, and seawater for cooling of zone 10 power plants (should they be seawater cooled). Additional capacity of supply of LNG and natural gas (NG) to third party off takers, potentially including the Dedisa peaking power plant, should this be converted to gas, will also be included. The key infrastructure includes the following: • Up to two floating storage and regasification units (FSRU), moored in the Port, which will receive, store and regasify the LNG from the LNG carrier (LNGC). This will be phase 1 of the project. It is proposed that onshore storage and regasification facilities will replace the FSRUs once the demand for NG reaches a point where onshore storage and regasification is the more feasible option, at which point the FSRU will be removed; • A new jetty with offloading platform and berthing facilities for the FSRU and LNGC in the port of Ngqura; • A trestle structure to support the gas and cryogenic pipelines running within the port from the offloading platform parallel to the eastern breakwater, to the point where the pipelines will cross under the breakwater near the admin craft basin, thereafter running underground; • An LNG and gas hub, consisting of storage and regasification facilities (for development in phase 2, once the FSRU is no longer the most feasible option), and a truck delivery centre for third party off-takers. Gas metering, admin, control rooms, workshops, and vents will be included in the LNG and gas hub; • Gas (for transmission of NG) and cryogenic (for transmission of LNG) pipelines from the FSRU and jetty to the three proposed power plants, as well as the boundary of the Dedisa power plant in Zone 13; • Pipelines for the transmission of seawater from the abstraction point in the port, to the zone 10 power plants (if seawater cooled) and regasification plant at the LNG and gas hub in Zone 10.

ApplicationDate: 

Tuesday, March 30, 2021 - 14:55

CaseID: 

16279

OtherReferences: 

ReferenceList: 

AdditionalDocuments
  1. PDF icon 553652_CDC Gas to Power_Gas Infra_ Draft EIA Report_Final.pdf
  2. PDF icon 553652_CDC Gas To Power_ Gas Infra_Draft EIR_Executive Summary_Final.pdf
  3. PDF icon 02_Appendix A_CV's of Project Team.pdf
  4. PDF icon Appendix B.pdf
  5. PDF icon 03_Appendix C _On-site and E- Notices.pdf
  6. PDF icon 04_Appendix D_Newspaper Notice.pdf
  7. PDF icon 05_Appendix E_ Appendix E_BID.pdf
  8. PDF icon 06_Appendix F_ ELC Presentations.pdf
  9. PDF icon 07_Appendix G1 _IAP Notification of BID.pdf
  10. PDF icon 08_Appendix G2_ IAP Notification of DSR.pdf
  11. PDF icon 10_Appendix G4_ IAP correspondence on BID.pdf
  12. PDF icon 11_Appendix G5_ IAP correspondence on DSR.pdf
  13. PDF icon 12_Appendix G6_ IAP correspondence on FSR.pdf
  14. PDF icon 13_Appendix G7_DEFF approval of FSR_Gas Infra.pdf
  15. PDF icon 14_ Appendix H1_PPP C&R Table on DSR _Gas Infra.pdf
  16. PDF icon Appendix H2_PPP comments & Response on FSR Table_Gas Infra_final.pdf
  17. PDF icon 17_Appendix J_Site Photographs.pdf
  18. PDF icon 18_Appendix K1_Air Quality Specialist Report_Gas Infra.pdf
  19. PDF icon 19_Appendix K2_ QRA_Gas Infra.pdf
  20. PDF icon 20_Appendix K3_Climate Change Specialist Report_Gas Infra.pdf
  21. PDF icon 21_Appendix K4_Noise Specialist Report_Gas Infra.pdf
  22. PDF icon 22_Appendix K5_Traffic Specialist Report_Gas Infra.pdf
  23. PDF icon 22_Appendix K5_Traffic Specialist Report_Gas Infra_Part1.pdf
  24. PDF icon 22_Appendix K5_Traffic Specialist Report_Gas Infra_Part2.pdf
  25. PDF icon 22_Appendix K5_Traffic Specialist Report_Gas Infra_Part3.pdf
  26. PDF icon 23_Appendix K6_Marine Specialist Report_Gas Infra.pdf
  27. PDF icon 553652_Appendix L_CDC Gas to Power_Gas Infra_ DraftEMPr_20210312.pdf
  28. PDF icon 09_Appendix G3_IAPnotification of FSR_Part1.pdf
  29. PDF icon 09_Appendix G3_IAPnotification of FSR_Part2.pdf
  30. PDF icon 09_Appendix G3_IAPnotification of FSR_Part3.pdf
  31. PDF icon 09_Appendix G3_IAPnotification of FSR_Part4.pdf
  32. PDF icon 16_Appendix I_Layout Drawings_Part1.pdf
  33. Image icon 16_Appendix I_Layout Drawings_Part2.png
  34. Image icon 16_Appendix I_Layout Drawings_Part3.png
  35. PDF icon 16_Appendix I_Layout Drawings_Part4.pdf
  36. PDF icon Gas Infrastructure FEIR_00_CDC Gas to Power_Gas Infra_Final EIA Report.pdf
  37. PDF icon Gas Infrastructure FEIR_02_Appendix A_CV's of Project Team.pdf
  38. PDF icon Gas Infrastructure FEIR_03_Appendix B_Application for EA_Gas Infra.pdf
  39. PDF icon Gas Infrastructure FEIR_04_Appendix C _On-site and E- Notices.pdf
  40. PDF icon Gas Infrastructure FEIR_05_Appendix D_Newspaper Notice.pdf
  41. PDF icon Gas Infrastructure FEIR_06_Appendix E_ Appendix E_BID.pdf
  42. PDF icon Gas Infrastructure FEIR_07_Appendix F_ ELC Presentations.pdf
  43. PDF icon Gas Infrastructure FEIR_08_Appendix G1 _IAP Notification of BID.pdf
  44. PDF icon Gas Infrastructure FEIR_09_Appendix G2_ IAP Notification of DSR.pdf
  45. PDF icon Gas Infrastructure FEIR_09_Appendix G3_IAPnotification of FSR_Part1.pdf
  46. PDF icon Gas Infrastructure FEIR_09_Appendix G3_IAPnotification of FSR_Part2.pdf
  47. PDF icon Gas Infrastructure FEIR_09_Appendix G3_IAPnotification of FSR_Part3.pdf
  48. PDF icon Gas Infrastructure FEIR_09_Appendix G3_IAPnotification of FSR_Part4.pdf
  49. PDF icon Gas Infrastructure FEIR_12_Appendix G5_ IAP correspondence on BID.pdf
  50. PDF icon Gas Infrastructure FEIR_11_Appendix G4_IAP Notification of Draft EIR_reduced.pdf
  51. PDF icon Gas Infrastructure FEIR_13_Appendix G6_ IAP correspondence on DSR.pdf
  52. PDF icon Gas Infrastructure FEIR_14_Appendix G7_ IAP correspondence on FSR.pdf
  53. PDF icon Gas Infrastructure FEIR_15_Appendix G8_IAP correspondence on Draft EIR.pdf
  54. PDF icon Gas Infrastructure FEIR_16_Appendix G9_DEFF approval of FSR_Gas Infra.pdf
  55. PDF icon Gas Infrastructure FEIR_17_ Appendix H1_PPP C&R Table on DSR _Gas Infra.pdf
  56. PDF icon Gas Infrastructure FEIR_18_Appendix H2_PPP C&R Table on FSR_Gas Infra.pdf
  57. PDF icon Gas Infrastructure FEIR_19_Appendix H3_PPP C&R Table on DEIR Table.pdf
  58. PDF icon Gas Infrastructure FEIR_20_Appendix I_Layout Drawings.pdf
  59. PDF icon Gas Infrastructure FEIR_21_Appendix J_Site Photographs.pdf
  60. PDF icon Gas Infrastructure FEIR_22_Appendix K1_Air Quality Specialist Report_Gas Infra.pdf
  61. PDF icon Gas Infrastructure FEIR_23_Appendix K2_ QRA_Gas Infra.pdf
  62. PDF icon Gas Infrastructure FEIR_24_Appendix K3_Climate Change Specialist Report_Gas Infra.pdf
  63. PDF icon Gas Infrastructure FEIR_25_Appendix K4_Noise Specialist Report_Gas Infra.pdf
  64. PDF icon Gas Infrastructure FEIR_26_Appendix K5_Traffic Specialist Report_Gas Infra.pdf
  65. PDF icon Gas Infrastructure FEIR_27_Appendix K6_Marine Specialist Report_Gas Infra.pdf
  66. PDF icon Gas Infrastructure FEIR_28_Appendix L_Final EMPr_Gas Infra.pdf
 
 

Search form