Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

21863 Northam Zondereinde 3 Shaft

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Northam Zondereinde (western extension) Mine proposed 3 Shaft with associated infrastructure on the Farms Elandsfontein and Zondereinde.

Expanded_Motivation: 

Due to Northam Platinum realising that it will be more feasible to sink an additional shaft for various reasons, which is discussed under Section 6.1 of the EIA report, the following shafts and surface infrastructure and associated activities are now required, which also requires environmental authorisation. The shafts will be positioned on two constructed terraces one for the up-cast ventilation shafts (Terrace 2) and one for the two access shafts and downcast ventilation shaft (Terrace 1). The two terraces will require a servitude between them for services. The servitude will carry buried power cables from the main consumer substation to the ventilation shafts. A servitude will be required between the current Zondereinde operations and Terrace 1. This servitude will carry service water, sewerage, backfill slurry, power cables, mud return pipeline and overhead power lines. Overhead power lines will be installed to connect Terrace 1 to the adjacent Eskom high voltage overhead lines. The existing two potable water pipelines will be diverted within the terrace area (1) and an off-take to the new facility will be done from one of the newly installed diversion pipelines. The current paved road from the R510 to the current shaft and concentrator facility will be diverted around Terrace 1 and an additional unpaved road will be required from the existing paved road to Terrace 2

ApplicationDate: 

Tuesday, July 9, 2019 - 11:04

CaseID: 

14035

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDateContactPersonFinalDecision
LP30/5/1/2/3/2/1/037 EM
11/08/2019

ReferenceList: 

AdditionalDocuments
  1. PDF icon Background Information Document
  2. PDF icon Scoping Report (Public Review)
  3. PDF icon EIAEMPR for Public Review
  4. PDF icon Heritage Sensitivity Map with Layout
  5. PDF icon Final EIA Report
  6. PDF icon Appendix 1 - DMR Scoping Report Acceptance Letter.pdf
  7. PDF icon Appendix 2_1 - EAP Company Profile.pdf
  8. PDF icon Appendix 2_2 - CV of EAP.pdf
  9. PDF icon Appendix 3 - EAP Qualifications.pdf
  10. Image icon Appendix 4_5 - Locality Position.png
  11. PDF icon Appendix 4_1 - Locality MRA.pdf
  12. Image icon Appendix 4_1 - Locality MRA.png
  13. PDF icon Appendix 4_2 - Aerial MRA.pdf
  14. Image icon Appendix 4_2 - Aerial MRA.png
  15. PDF icon Appendix 4_3 - Aerial Layout.pdf
  16. Image icon Appendix 4_3 - Aerial Layout.png
  17. PDF icon Appendix 4_4 - Locality Layout.pdf
  18. Image icon Appendix 4_4 - Locality Layout.png
  19. PDF icon Appendix 5 - Impact Assessment.pdf
  20. PDF icon Appendix 6 - SLP Part 1_compressed.pdf
  21. PDF icon Appendix 6 - SLP Part 2.pdf
  22. PDF icon Appendix 7_1 - Geotechnical Report.pdf
  23. PDF icon Part 1_Major Events.pdf
  24. PDF icon Part 2_ZND05 ATV structure log (bottom).pdf
  25. PDF icon Part 3_ZND05 ATV structure log (top).pdf
  26. PDF icon Part 4_ZND05 flow profile log.pdf
  27. PDF icon Part 5_ZND05 geotechnical log.pdf
  28. PDF icon Part 6_ZND05 lithology log.pdf
  29. PDF icon Part 7_ZND05 rock strength log.pdf
  30. PDF icon Appendix 8 - Site Plan.pdf
  31. PDF icon Appendix 9_1 - I&AP Register and Database.pdf
  32. PDF icon Appendix 9_2_1 - Proof of Newspaper Notice 1.pdf
  33. PDF icon Appendix 9_2_2 - Proof of EIA newspaper notice
  34. PDF icon Appendix 9_3_1- Proof of Site Notices_1st.pdf
  35. PDF icon Appendix 9_3_2 - Proof of Site Notices_2nd.pdf
  36. PDF icon Appendix 9_4_1 - Proof of Written Notices.pdf
  37. PDF icon Appendix 9_4_2 - Proof of Written NoticesEIA.pdf
  38. PDF icon Appendix 9_5_1 - Proof of Delivery of DSR.pdf
  39. PDF icon Appendix 9_5_2 - Proof of Delivery of DEIREMPR.pdf
  40. PDF icon Appendix 9_6_1 - Directions.pdf
  41. PDF icon Appendix 9_6_2 - Attendance Register.pdf
  42. PDF icon Appendix 9_6_3 - Presentation.pdf
  43. PDF icon Appendix 9_6_4 - Photographs.pdf
  44. PDF icon Appendix 9_7_1- Communication to and from I&APs_Scoping.pdf
  45. PDF icon Appendix 9_7_2 - Communication to and from I&APs EIA.pdf
  46. PDF icon Appendix 9_8 - C&R Report.pdf
  47. PDF icon Appendix 10_1 - Geohydrological Report.pdf
  48. PDF icon Appendix 10_2 - Biodiversity Impact Assessment.pdf
  49. PDF icon Appendix 10_3 - Surface Water Assessment.pdf
  50. PDF icon Appendix 10_4 - Heritage Impact Assessment.pdf
  51. PDF icon Appendix 11_1 - Final Site Map_Layout&Servitudes.pdf
  52. PDF icon Appendix 11_2 - Final Site Map_Layout.pdf
  53. PDF icon Appendix 13 - Confirmation of Services.pdf
  54. PDF icon Appendix 14 - Proof of Submission of WULA.pdf
 
 

Search form