MyReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 16101 - 16150 of 18975
ReportRef ReportDate ReportFile
HIA FOR TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, 03/11/2020 PDF icon Phase 1 HIA Report, PDF icon Status Quo Report, PDF icon Chance Finds Procedure
ARCHAEOLOGICAL DESKTOP STUDY 26/10/2021 PDF icon Annexure 3 – Archaeological Desktop Study.pdf
HIA for the Proposed 100MW PV Plant at the Samancor Chrome Operations, Steelpoort, Limpopo 20/05/2021 PDF icon E6 - Heritage.pdf
Clapham HIA 18/10/2021 PDF icon Heritage Impact Assessment Clapham Dam Upgrades Final Report.pdf
Phase 1 – Heritage Impact Assessment for THE PROPOSED ESKOM AZAADVILLE 4KM 400kV DEVIATION POWER LINE 27/09/2021 PDF icon Heritage Impact Assessment.pdf, PDF icon Palaeontological Desktop Assessment.pdf
Proposed Letter of Exemption construction of a telecommunication mast on the Farm Klipheuwel 291 05/11/2021 PDF icon PIA Letter of Exemption, Louterwater Telecommunication Mast, PDF icon Final Basic Assessment Report - Proposed Louterwater Telecommunication Mast, PDF icon Report Enviroafrica Louterwater telecoms mast Archaeology LOE.pdf
Erf 7134 25/10/2021 PDF icon 2021 10 25 SLR 80 report for comment 1 - 14.pdf, PDF icon 2021 10 25 SLR 80 report for comment 15-20.pdf, PDF icon 2021 10 25 SLR 80 report for comment 21-43.pdf, PDF icon 2021 10 25 SLR 80 report for comment 44-61.pdf, PDF icon 2021 10 25 SLR 80 report for comment 62-73.pdf, PDF icon 2021 10 25 SLR 80 report for comment 74-83.pdf, PDF icon Annexure C 00.STOREY LAYOUTS_2021.09.14 PROJECT 80 REVISED SCHEME.pdf, PDF icon Annexure C 01.REV ELEVATIONS_2021.09.16 PROJECT 80 REVISED SCHEME.pdf
HIA report Manyeding Mothibistad 22 kV powerline 03/11/2021 PDF icon HIA report for Manyeding Mothibistad 22 kV powerline
PIA report Manyeding Mothibistad 22 kV powerline 30/10/2021 PDF icon PIA report Manyeding-Mothibistad PL_Final.pdf
Ngwenya Expansion HIA 03/12/2018 PDF icon FPC1706.pdf
Desktop Study Phase 1 22/08/2021 PDF icon PIA report Wembezi retail Klipplaatdrift 22Aug2021 rev.pdf
40884 De Put De-Sludge 31/08/2021 PDF icon 2827 BC Senekal MDA HIA_Senekal DePut De-Sludge Area.pdf
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng 10/11/2021 PDF icon Elemental Sustainability - Knopjeslaagte_Diepsloot_AIA_v1.pdf
Request for Exemption of any Palaeontological Impact Assessment for the proposed Kilo Sands Township on Knoppieslaagte 385JR, Centurion, Gauteng Province. PDF icon Letter Req exemption SAHRA.pdf
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Township Development on Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng PDF icon Elemental Sustainability - Knopjeslaagte_Diepsloot_AIA_v1.pdf
HIA Waterkloof Open Cast Mine 02/06/2021 PDF icon HIA for the Waterkloof OC
Palaeontological Impact Assessment for the proposed residential development on Griffiths Road, Equestria Ext 283, Gauteng Province 09/08/2021 PDF icon PIA report Equestria Ext 283 Griffiths Rd resid devpmt 09Aug2021.pdf
PIA Siza PDF icon Appendix T - Heritage Impact Assessment.pdf
PHASE 1 HIA REPORT FOR THE PROPOSED CAVALIER ABATTOIR EXPANSION PROJECT 02/08/2021 PDF icon PHASE 1 HIA REPORT CAVALIER ABATTOIR EXPANSION APAC02176.pdf
APPLICATION FOR EXEMPTION FROM A HERITAGE IMPACT ASSESSMENT FOR 82 FURROW ROAD, EQUESTRIA (00049 WILLOWGLEN A/H) AND PORTION 708 (A PORTION OF PORTION 81) OF THE FARM WILLOWS 17/08/2021 PDF icon Beyond Heritage Letter of Exemption Furrow Road 001.pdf
Palaeontological Impact Assessment for the proposed residential development on Furrow Road, Equestria Ext 283, Gauteng Province 09/08/2021 PDF icon PIA report Equestria Ext 284 Furrow Rd Aug2021.pdf
HIA Jouberton X34 & Kanana X16 01/09/2019 PDF icon Phase 1 HIA for Jouberton X34 and Kanana X16
Application for bulk water infrastructure on the farm Nosilla 27JU, White River / Hazyview 10/11/2021 PDF icon HIA Nosilla, PDF icon Photographic documentation, Nosilla
34 Bishop Road, Windermere, Berea 02/11/2021 PDF icon 34 Bishop Road Durban.pdf
PIA desktop 29/10/2021 PDF icon PIA desktop report
HIA report 08/11/2021 PDF icon HIA report
PIA report 29/10/2021 PDF icon PIA report Pampierstad 22 kV line_08.11.21.pdf
HIA report 08/11/2021 PDF icon HIA report
HIA Taaiboschfontein EIA 11/11/2020 PDF icon HIA EIA Phase
Phase 1 HIA New Luckhoff SWS 31/08/2021 PDF icon Phase 1 HIA Report New Luckhoff SWS
Heritage Impact Assessment (Nov'21) 11/11/2021 PDF icon Appendix I - Heritage Impact Assessment.pdf
Heritage Impact Assessment (Nov'21) 11/11/2021 PDF icon Appendix I - Heritage Impact Assessment.pdf
Heritage Impact Assessment (Nov'21) 11/11/2021 PDF icon Appendix I - Heritage Impact Assessment.pdf
Heritage Impact Assessment (Nov'21) 11/11/2021 PDF icon Appendix I - Heritage Impact Assessment.pdf
Heritage Impact Assessment (Nov'21) 11/11/2021 PDF icon AppH - Heritage Impact Assessment.pdf
PIA 57A North Beach Road 09/06/2021
PIA 57A North BEach Road, Westbrook 09/06/2021 PDF icon 4. PIA.pdf
PIA for Expansion of Infrastructure at 99 Colwyn Drive, Sheffield. 06/07/2021 PDF icon 4. PIA Report 99 Colwyn Drive.pdf
PHASE 1 HIA -MATWABENG PDF icon PHASE 1 HIA MATWABENG TOWNSHIP APAC02198.pdf
Heritage Impact Assessment (Nov'21) 12/11/2021 PDF icon Sun Garden App I - HIA.pdf
Heritage Impact Assessment (Nov'21) 12/11/2021 PDF icon Solaris Fields App I - HIA_compressed.pdf
HIA FOR A CAUSTIC-SODA MAKE UP PLANT, GAUTENG 11/08/2021 PDF icon HIA.Batach.30.08.2021.FINAL-signed.pdf
AIA for Proposed Cubhu Water Treatment Plant and Pipeline 15/10/2021 PDF icon Cubhu Eskhaleni Pipeline Project Rev.01.pdf, PDF icon BID-Cubhu WTW update_9km rising main pipeline project.pdf
HIA Report Sutherland & Rietrug WEF Grid Infrastructure 04/11/2021 PDF icon Heritage Impact Assessment for the proposed new 132kV Powerline & switching station for the Sutherlande & Rietrug WEFs
PIA for the Proposed new grid infrastructure for the Sutherland & Rietrug WEFs 08/11/2021 PDF icon Palaeontological Impact Assessment for the proposed new 132kV power line and switching station for the Sutherland & Rietrug WEFs
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT 06/08/2021 PDF icon PHASE 1 HIA RIETVLEI EXTENSION 24 APAC02166.pdf
HIA Report for the 33kV/132kV substation and associated infrastructure for the Sutherland & Rietrug WEFs 04/11/2021 PDF icon Heritage Impact Assessment for the Proposed 33kV/132kV substation and associated infrastructure for the Sutherland &Rietrug WEFs
PIA for the proposed new 33kV/132kV substation & associated infrastructure for the Sutherland & Rietrug WEFs 08/11/2021 PDF icon Palaeontological Impact Assessment for the proposed new 33kV/132kV substation & associated infrastructure
Heritage Scoping: Phakwe Richards Bay Gas Power 3 2000 MW Combined Cycle Gas to Power Plant (PRBGP3) 15/11/2021 PDF icon CTS19_059_Savannah_Richards Bay Gas 2 Power.pdf.pdf, PDF icon 20220613 PRBGP3 AMAFA application-form-j-developments.pdf
CMP Voortrekker Monument 09/12/2021 PDF icon CMP Part I, PDF icon CMP Part II

Pages

 
 

Search form