Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Lesaka 1 Solar Energy Facility (SEF) and Associated Infrastructure

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Proposed Development of the Lesaka 1 Solar Energy Facility (SEF) and Associated Infrastructure near Loeriesfontein in the Northern Cape Province

ApplicationDate: 

Thursday, February 23, 2023 - 12:25

CaseID: 

20717

OtherReferences: 

CaseReferenceDepartmentApplicationType
14/12/16/3/3/2/2327

ReferenceList: 

AdditionalDocuments
  1. PDF icon Appendix 2 Maps.pdf
  2. PDF icon Appendix 3_Site Layout.pdf
  3. PDF icon Appendix 5_Public Participation.pdf
  4. PDF icon Lesaka 1 Agriculture 230307.pdf
  5. PDF icon Lesaka 1_ Solar_Avifauna Scoping Report.pdf
  6. PDF icon Lesaka PVSEF 1 Freshwater Assessment.pdf
  7. PDF icon Lesaka SEF 1_Terrestrial_Biodiversity_report.pdf
  8. PDF icon Lesaka 1 PV SEF Social Scoping Report March 2023.pdf
  9. PDF icon Lesaka 1 SEF EGI_SRK Visual Scoping Report_V3_final.pdf
  10. PDF icon Lesaka 1 SEF_EGI_SRK_SSVR.pdf
  11. PDF icon Geotechnical Report_Lesaka SEF 1.pdf
  12. PDF icon Lesaka 1 SEF_Transportation Study.pdf
  13. PDF icon Lesaka Solar Energy Facility - BESS - High Level SHE RA March 2023.pdf
  14. PDF icon Appendix 7_SiVEST Impact Rating System.pdf
  15. PDF icon Appendix 8_DFFE Screening Tool.pdf
  16. PDF icon 01_Lesaka 1 SEF Draft Scoping Report rev 1.0 08032023 Final.pdf
  17. PDF icon Appendix 2_Maps.pdf
  18. PDF icon Appendix 3_Site Layout.pdf
  19. PDF icon Appendix 4_Photographs.pdf
  20. PDF icon Appendix 5_Public Participation.pdf
  21. PDF icon Lesaka 1 Agriculture 230718.pdf
  22. PDF icon Lesaka 1_ Solar_Avifauna.pdf
  23. PDF icon CBA feedback_specialist opinion_5 April 2023.pdf
  24. PDF icon Lesaka PVSEF 1 Freshwater Assessment.pdf
  25. PDF icon LESAKA SEF Northern Cape CBA Opinion Letter.pdf
  26. PDF icon CBA feedback_specialist opinion_5 April 2023.pdf
  27. PDF icon Lesaka SEF 1_Terrestrial_Biodiversity.pdf
  28. PDF icon Lesaka 1 PV SEF SIA Report 20 July 2023.pdf
  29. PDF icon Lesaka 1 SEF VIA.pdf
  30. PDF icon Lesaka 1 SEF_EGI_SRK_SSVR.pdf
  31. PDF icon Lesaka 1 SEF Geotech.pdf
  32. PDF icon Lesaka 1 SEF_Transportation Study.pdf
  33. PDF icon Lesaka SEF_BESS_High Level SHE RA.pdf
  34. PDF icon Lesaka SEF 1 Hydrological Assessment.pdf
  35. PDF icon Appendix 7_SiVEST EIA Method.pdf
  36. PDF icon Appendix 7_SiVEST Impact Method_Social.pdf
  37. PDF icon Appendix 8_DFFE Screening Tool_Lesaka 1 SEF.pdf
  38. PDF icon Appendix 8_DFFE Screening Tool_Lesaka 1 Substation.pdf
  39. PDF icon Appendix 10_EMPr_Lesaka 1 SEF Draft EMPr.pdf
  40. PDF icon Appendix 10_EMPr_Lesaka 1 SEF Generic Substation Draft EMPr.pdf
  41. PDF icon Lesaka 1 SEF DEIAr rev 1.0 21072023 Final.pdf
  42. PDF icon Appendix 2_Maps.pdf
  43. PDF icon Appendix 3_Site Layout.pdf
  44. PDF icon Appendix 4_Photographs.pdf
  45. PDF icon Appendix 5_Public Participation.pdf
  46. PDF icon Lesaka 1 Agriculture 230905.pdf
  47. PDF icon CBA feedback_specialist opinion_5 April 2023.pdf
  48. PDF icon Lesaka 1_ Solar_Avifauna_Setember_2023_Final.pdf
  49. PDF icon Lesaka PVSEF 1 Freshwater Assessment AMENDED.pdf
  50. PDF icon LESAKA SEF Northern Cape CBA Opinion Letter.pdf
  51. PDF icon CBA feedback_specialist opinion_5 April 2023.pdf
  52. PDF icon Lesaka SEF 1_Terrestrial_Biodiversity_report_30Aug2023.pdf
  53. PDF icon Lesaka 1 PV SEF SIA Report 30 August 2023.pdf
  54. PDF icon Lesaka 1 SEF_EGI_SRK VIA_August 2023_v3.pdf
  55. PDF icon Lesaka 1 SEF_EGI_SRK_SSVR.pdf
  56. PDF icon Lesaka SEF 1_Geotech F4.pdf
  57. PDF icon 17793_Lesaka 1 SEF_Transportation Study.pdf
  58. PDF icon Lesaka SEF_BESS_High Level SHE RA Sep 2023.pdf
  59. PDF icon Hydrological Assessment_Lesaka 1 SEF 2.0.pdf
  60. PDF icon Appendix 7_SiVEST Impact Rating System Social.pdf
  61. PDF icon Appendix 7_SiVEST Impact Rating System.pdf
  62. PDF icon Appendix 8_DFFE Screening Tool SEF.pdf
  63. PDF icon Appendix 8_DFFE Screening Tool Substation.pdf
  64. PDF icon Appendix 10_Lesaka 1 EMPr.pdf
  65. PDF icon Appendix 10_Lesaka 1 Generic Substation.pdf
  66. PDF icon 17793 Lesaka 1 SEF FEIAr rev 1.0 08092023 Final .pdf
 
 