MyReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 50 of 77
ReportRef ReportDate ReportFile
Phase 1 Cultural Heritage Impact Assessment: Mimosa 61 03/04/2018 PDF icon 2018JvS013EIA210Mimosa.pdf
Phase 1 Cultural Heritage Impact Assessment: Heuningkrans 137 16/04/2018 PDF icon 2018JvS021EIA235Heuningkrans.pdf
Phase 1 Heritage Assessment for Expansion of existing quarry near Matjiesfontein 15/06/2018 PDF icon Heritage Assessment Tweedside.pdf
Phase 1 Heritage Assessment for borrow pit on the farm Ek Kraal 15/06/2018 PDF icon Heritage study Ek Kraal quarry.pdf
HIA report - Eloffspark 28/06/2018 PDF icon 2018JvS024Eloffspark.pdf
Cultural Heritage assessment of quarries for rehabilitation of N2 section 19 09/07/2018 PDF icon Appendix K - Final heritage quarries.pdf
MOGALAKWENA MINI WATER SCHEME PIPELINE 31/07/2017 PDF icon Appendix D.3 - Heritage Assessment Report.pdf
Lenasia South Reservoir HIA Report 28/09/2018 PDF icon Appendix G2 - Heritage Impact Assessment.pdf, PDF icon Appendix B - Site Photographs.pdf, PDF icon Appendix C - Drawings of Reservoir Floor Slab Options.pdf, PDF icon Lenasia reservoir EMPr Jan 2019.pdf, PDF icon Appendix G1 - Terrestrial Biodiversity Assessment.pdf, PDF icon Appendix I4 - Geotechnical report.pdf, PDF icon Lenasia DBAR - 2019_draft Feb.pdf, PDF icon Appendix I5 - Engineers Preliminary Design Report.pdf
Lenasia South Reservoir HIA Report 28/09/2018 PDF icon Lenasia DBAR - 2019_draft Feb.pdf, PDF icon Appendix B - Site Photographs.pdf, PDF icon Appendix C - Drawings of Reservoir Floor Slab Options.pdf, PDF icon Appendix G1 - Terrestrial Biodiversity Assessment.pdf, PDF icon Appendix H - Lenasia reservoir EMPr Jan 2019.pdf, PDF icon Appendix I4 - Geotechnical report.pdf, PDF icon Appendix I5 - Engineers Preliminary Design Report.pdf
Demolishing of old concrete bridge 21/02/2019 PDF icon Documentation of structures.pdf
Mashimong Park Heritage Report 01/02/2019 PDF icon Mashimong Park HIA
Jan Smut Park Heritage Report 01/02/2019 PDF icon 2019JvS016JanSmutsPark.pdf
HIA - Pikitup Marlboro 30/01/2019 PDF icon 2019JvS007MarlboroPIU.pdf
HIA - Pikitup Sandpark 30/01/2019 PDF icon 2019JvS009SandParkPIU.pdf
The Gladys Lodge 29/07/2019 PDF icon 2019JvS067KlaserieLodge.pdf
Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED TOWNSHIP DEVELOPMENT ON PORTIONS 68 & 83 OF THE FARM HARTEBEESTPOORT 328JR 30/09/2019 PDF icon Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED TOWNSHIP DEVELOPMENT ON PORTIONS 68 & 83 OF THE FARM HARTEBEESTPOORT 3
Phase 1 Cultural Heritage Impact Assessment - THE PROPOSED UPGRADE OF THE MONTANA SPRUIT CHANNEL WITHIN THE DOORNPOORT AND MONTANA PARK RESIDENTIAL AREA, NORTH OF PRETORIA, GAUTENG PROVINCE 30/04/2019 PDF icon Phase 1 Cultural Heritage Impact Assessment.pdf
Phase 1 Cultural Heritage Impact Assessment: Johan Smit 10/12/2019 PDF icon 2019JvS102EIA373.pdf
The Rehabilitation of Hy-Many dam, Johannesburg Metopolitan Municipality 27/05/2020 PDF icon Heritage Phase 1 (Hy-Many Dam).pdf
LETTER OF RECOMMENDATION FOR EXEMPTION 13/07/2020 PDF icon 2020JvS047BAR181B.pdf
Phase 1 Cultural Heritage Impact Assessment: OF THE FARM READS DRIFT 74, DOUGLAS REGION, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE 01/11/2019 PDF icon 2019JvS099ReadsDrift(EIA365).pdf
Stormill Ext 2Sewer Pipe Replacement 31/03/2020 PDF icon Stormill Ext 2 HIA, PDF icon DBAR - Stormill Ext 2 Sewer.pdf
Stormill Ext 2 Sewer Pipe Replacement 31/03/2020 PDF icon Stormill Ext 2 HIA, PDF icon Stormill Ext 2 DBAR
Phase 1 Cultural Heritage Impact Assessment: 01/11/2019 PDF icon 2019JvS099ReadsDrift(EIA365).pdf
Heritage Report N11 09/11/2020 PDF icon 16 Appendix D - Heritage Report.pdf
Phase 1 Cultural Heritage Impact Assessment:THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) 13/10/2020 PDF icon 2020JvS061EIA402Rooibult.pdf
Phase 1 Cultural Heritage Impact Assessment 01/07/2020 PDF icon Heritage Report.pdf
Phase 1 Cultural Heritage Impact Assessment: PDF icon 2020JvS043EIA380Zandheuvel.pdf
Phase 1 Cultural Heritage Impact Assessment: PDF icon 2020JvS043EIA380Zandheuvel.pdf
HIA Stormvoel to Baviaanspoort Road including the Moepel Road Overpass 27/05/2020 PDF icon 2020JvS039BaviaansStormvoel.pdf
Phase 1 Cultural Heritage Impact Assessment: 24/11/2020 PDF icon 2020JvS076BAR189.pdf
Phase 1 Cultural Heritage Impact Assessment: 23/11/2020 PDF icon 2020JvS076BAR189.pdf
2021JvS002EIA443 29/01/2021 PDF icon Wouterspan Mining PDA_EButler 16-03-2021, PDF icon Wouterspan Mining PDA_EButler 16-03-2021.pdf
Revised Phase 1 Cultural Heritage Impact Assessment: 14/02/2021 PDF icon 2020JvS043EIA380Zandheuvel Revised.pdf
Revised Phase 1 Cultural Heritage Impact Assessment: 18/02/2021 PDF icon 2020JvS076BAR189 revised.pdf
HIA for Quarry 6B 09/03/2021 PDF icon HIA
HIA for Quarry 6A 09/03/2021 PDF icon HIA
Phase 1 Cultural Heritage Impact Assessment: 01/03/2021 PDF icon 2021JvS009EIA395MR.pdf
2020/JvS/051Wouter 01/07/2020 PDF icon 3. 2020JvS051Wouter.pdf
2020/JvS/051Wouter 01/07/2020 PDF icon 3. 2020JvS051Wouter.pdf
Phase 1 Cultural Heritage Assessment: THE DEVELOPMENT OF THE PROPOSED MOGALE EXTENSIONS 42, 43 AND 44 TOWNSHIPS 01/09/2019 PDF icon Phase 1 Heritage Report
Impala SPP HIA PDF icon Appendix D5 - Heritage Impact Assessment.pdf
REPAIR OR REPLACEMENT OF BRIDGES AND CULVERT STRUCTURES ON TRUNK ROADS 3305, 3501, 5801, DIVISIONAL ROAD 2307 AND MAIN ROAD 584 27/05/2021 PDF icon Appendix G - Heritage Specialist Study.pdf
Phase 1 Cultural Heritage Impact Assessment Mosikwe 31/03/2019 PDF icon 2019JvS021Bakhoutrandje.pdf
HIA Oshoek Land Port Entry 01/01/2018 PDF icon 2018JvS002Oshoek (1).pdf
MATJHABENG SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE SYSTEMS PROJECT: PHASE 1 AND PHASE 2 POWER LINES 02/11/2020 PDF icon 2020JvS069MatjhabengPVPowerLines.pdf
MATJHABENG SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE SYSTEMS PROJECT: PHASE 1 AND PHASE 2 POWER LINES 16/11/2020 PDF icon 2020JvS068MatjhabengPV.pdf, PDF icon 10716-20210811-Draft BAR.pdf
Phase 1 Cultural Heritage Impact Assessment: 18/08/2021 PDF icon 2021JvS060LaurenceDale.pdf
Phase 1 Heritage Impact assessment for remainders of portions 279 and 285 of the Farm Garsfontein 374 13/08/2021 PDF icon 2021JvS059Garstfontein.pdf
K-WWTW Phase 1 Cultural Heritage Impact Assessment 24/05/2021 PDF icon 2021JvS035KWWTW.pdf

Pages

 
 

Search form