MyReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 16651 - 16700 of 18975
ReportRef ReportDate ReportFile
Koup 1 Grid HIA 23/04/2022 PDF icon 449HIA- Koup 1 HIA_Rev 3.0 23042022.pdf, PDF icon 449HIA- Koup 1 AIA_ 19042022.pdf, PDF icon Koup 1 WEF CLA SiVEST ver3 apr22.pdf, PDF icon Beaufort West Koup 1 WEF PIA rev4.pdf
Koup 2 Grid HIA 30/05/2022 PDF icon 449HIA- Koup 2 HIA_Rev 3.0 23042022.pdf, PDF icon 449HIA- Koup 2 AIA 19042022.pdf, PDF icon Koup 2 WEF CLA SiVEST apr22.pdf, PDF icon Beaufort West Koup 2 WEF PIA rev2.pdf
Construction of a telecommuniction mast on the Farm Brakkefontein, Neslon Mandela Municipality, Eastern Cape 22/02/2022 PDF icon Report Enviroafrica telecoms mast on Farm Brakkefontein 416 Rocklands - Archaeology Letter of Exemption.pdf, PDF icon Brakkefontein LOE.pdf
Zandfontein 13/10/2021 PDF icon PHASE 1 HIA REPORT ZANDFONTEIN 317JR APAC02193.pdf
Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADE OF NATIONAL ROAD R36 SECTION 6 FROM MANCHABENI (KM 4.70) TO TZANEEN (KM 33.40) 15/09/2021 PDF icon 2021JvS070R36Section6.pdf
HIA Desktop study for the Proposed Development of the Gidfuels Filling Station and Its Associated Infrastructures on the Farm M’phatlele 457 KS. 29/04/2022 PDF icon HIA Desktop study for the Proposed Development of the Gidfuels Filling Station and Its Associated Infrastructures on the Farm M’phatlele 457 KS..pdf
HERITAGE SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO 29/11/2021 PDF icon Heritage Specialist Opinion.pdf
Palaeontological Opinion for the Revised layout of ICE for the authorised Bokpoort Solar Power Facility (Project DAO) near Groblershoop, Northern Cape Province 22/11/2021 PDF icon PIA specialist opinion
Labore Graves Exhumation Report 31/03/2022 PDF icon Labore exhumation report
Heritage Report for the expansion of Kokosi Cemetery 15/02/2022 PDF icon Phase 1 HIA for the Expansion of Kokosi Cemetery
Paleontology Desktop Assessment 26/02/2022 PDF icon Paleontology Desktop Assessment
Cultural/Heritage Desktop Assessment 01/03/2022 PDF icon Cultural/Heritage Desktop Assessment
HIA FOR PROPOSED PROSPECTING ON PORTION ON PORTION 21 OF WAAI FONTEIN 301-ES 28/04/2022 PDF icon Application Form AMAFA, PDF icon Proof of Payment, PDF icon Letter of concern
PALAEONTOLOGICAL DESKTOP ASSESSMENT 11/05/2022 PDF icon Aansluit PDA_EButler 09-04-2022 Fin.pdf
Phase 1 Cultural Heritage Impact Assessment: 03/05/2022 PDF icon 2022JvS023EMP007.pdf
PALAEONTOLOGICAL DESKTOP ASSESSMENT 11/04/2022 PDF icon Aansluit PDA_EButler 09-04-2022 Fin.pdf
Bellevue Campus : The House PDF icon AMAFA FORMS.pdf, PDF icon 5BR100PLANSSECTIONELEVATIONScAMAFA.pdf, PDF icon 5BR101DOORANDWINDOWSCHEDULE.pdf
Mahwelereng HIA PDF icon HIA Mahwelereng Shopping Centre.pdf
Heritage input optimised layout 28/04/2022 PDF icon SE2602 Wind Garden App S6 - Heritage input optimised layout.pdf
Paleo input optimised layout 28/04/2022 PDF icon SE2602 Wind Garden App S7 - Paleo input optimised layout.pdf
Heritage input optimised layout 28/04/2022 PDF icon SE2602 Fronteer App S6 - Heritage input optimised layout.pdf
Paleo input optimised layout 28/04/2022 PDF icon SE2602 Fronteer App S7 - Paleo input optimised layout.pdf
96ClarkRd-VIA-2022-04-28 28/04/2022 PDF icon 96ClarkRd-VIA-2022-04-28 Heritage Report.pdf
96ClarkRd-VIA-2022-04-28 28/04/2022 PDF icon HERITAGE REPORT
Annandale residential development, Balgowan 01/03/2022 PDF icon Phase 1 HIA report, PDF icon Appendix 1, PDF icon Appendix 2, PDF icon Form J
Heritage Impact Assessment for the proposed expansion of the Esizayo Wind Energy Faciliity 28/04/2022 PDF icon Esizayo Expansion HIA_Draft_2022-04-28.pdf
COLIGNY TOWNSHIP DEVELOPMENT 06/05/2022 PDF icon COLIGNY PROPOSED RESIDENTIAL UNITS
Phofu SPP HIA PDF icon Appendix D5 - Heritage Impact Assessment.pdf
Phofu SPP PIA PDF icon Appendix D6 - Palaeontological Impact Assessment.pdf
FORMALISATION OF LETHLABILE INFORMAL SETTLEMENT 06/05/2022 PDF icon LETHLABILE FORMALISATION HIA
DWARSLOOP TOWNSHIP ESTABLISHMENT 06/05/2022 PDF icon Appendix G3 - HERITAGE IMPACT ASSESSMENT DWARSLOOP BUSHBUCK RIDGE.pdf
MIDRAND LICENSING PROPOSED OFFICE BLOCK 06/05/2022
RAMOSUKULA SCHOOL UPGRADE 06/05/2022 PDF icon RAMOSUKULA HIA
REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE SEFATENG CHROME MINE PROJECT 60KM NORTH-WEST OF BURGERSFORT, SEKHUKHUNE DISTRICT MUNICIPALITY 01/01/2019 PDF icon Appendix 14 - Heritage Assessment.pdf
Heritage Impact Assessment for the Proposed Mapungubwe Facilities, Limpopo Province 31/01/2020 PDF icon D2 - Heritage Impact Ass.pdf
PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, LIMPOPO PROVINCE 25/04/2022 PDF icon Eskom Mhinga Route Deviation Project EBUTLER May 2022 (004).pdf
HMP for the VLNR Lodge, Limpopo Province 05/10/2021 PDF icon Heritage Site Management Plan VLNR Final.pdf
MUM Preferent Prospecting Right Phase 1 Cultural Heritage Impact Assessment Report 26/04/2022 PDF icon Revised MUM Phase 1 Heritage Impact Assessment
Quiver Tree Lodge HIA 31/03/2022 PDF icon Quiver Tree Lodge HIA.pdf
HIA for the proposed Bethal – Emzinoni 88kV 04/03/2022
Heritage and Cultural Report 30/11/2021 PDF icon Heritage and Cultural Resources Report for LIU Energy Facility near Springbok, PDF icon Final Background Information Document (BID) for Liu Energy Springbok.pdf
Heritage Impact Assessment for the proposed Roan 2 PV facility and associated infrastructure near Hartbeesfontein, North-West Province 07/04/2022 PDF icon 10 Appendix E5 Heritage Impact Assessment Roan 2.pdf
Palaeontological Impact Assessment for the proposed Roan PV 1 and 2 facilities, Hartbeesfontein, North West Province 06/03/2022 PDF icon 11 Appendix E6 Palaeontology Impact Assessment.pdf
Heritage Impact Assessment for the proposed Roan 1 PV facility and associated infrastructure near Hartbeesfontein, North-West Province 06/04/2022 PDF icon 10 Appendix E5 Heritage Impact Assessment Roan 1.pdf
Lakeside industrial & associated services project, KwaDukuza 05/04/2022 PDF icon Phase 1 HIA report, PDF icon Built heritage statement, PDF icon Built heritage impact assessment report, PDF icon Desktop palaeontological study
Palaeontological Impact Assessment for the proposed Lekwa Local Municipality Cemetery at Morgenzon, Mpumalanga Province 10/08/2021
Greater Ukuwela Nature Reserve HIA 07/07/2021 PDF icon Appendix F4 - HIA Desktop.pdf, PDF icon Appendix F4 - Declaration Umlando.pdf
kwanyuswa 27/03/2022 PDF icon KwaNyuswa v4.pdf
Coal prospecting activities on Farms Zalflager, Ongemaakt & Mademoiselle near Vryheid 19/04/2022 PDF icon Desktop palaeontological assessment, PDF icon Phase 1 HIA report
National Monuments Council Survey Report 01/05/1995 PDF icon HeritageReportPDF

Pages

 
 

Search form