MyReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 50 of 137
ReportRef ReportDate ReportFile
9-2-303-0003-20060201-PBA 01/02/2006 PDF icon 9-2-303-0003-20060201-PBA_0.pdf
HIA_Hangklip_solar_10MW_Beater_J_Dec11 04/12/2011 PDF icon HIA_Hangklip_solar_10MW_Beater_J_Dec11_0.pdf
Phase 1 HIA for Proposed Truck and Warehousing Facility, Estcourt, KwaZulu Natal 23/04/2014 PDF icon 4 HIA report.pdf, PDF icon 5 PIA report.pdf
Proposed new 15Ml concrete reservoir, Lenasia South 10/11/2014 PDF icon 10539_20141124_Proposed new 15Ml Concrete Reservoir_Lenasia South_Heritage Impact Assessment.pdf
Proposed new 15Ml concrete reservoir, Lenasia South 10/11/2014 PDF icon Desktop Paleontological Assessment, PDF icon Heritage Impact Assessment - Reservoir, PDF icon Environmental Screening Report
Construction of a water supply pipeline and scour pipeline, Lenasia South, Gauteng Province 12/12/2014 PDF icon Palaeontological desktop assessment for pipelines & reservoir, PDF icon Heritage Impact Assessment - Pipelines, PDF icon Environmental Screening Report
Riverside Cemetery HIA 01/01/2014 PDF icon Riverside HIA
Riverside Cemetery HIA 01/01/2014 PDF icon Riverside HIA
Riverside Cemetery HIA 01/01/2014 PDF icon HIA
Construction of Water Supply Pipeline, Hammarsdale, KwaZulu Natal 20/04/2015 PDF icon 50044_20150519_Proposed new water pipeline_Hammarsdale_Heritage Impact A_Final.pdf
Barton Place Housing Project HIA 27/08/2015 PDF icon 20150811_Barton Place Housing Development_Heritage Impact Assessment_v2.pdf
JG Zuma Secondary School 30/09/2015 PDF icon HIA Letter of Exemption_JG Zuma School.pdf
Burbreeze HIA 23/11/2015 PDF icon Proposed Burbreeze Water Infrastructure Project_HIA_amended Feb 2016_compressed.pdf
Kingsburg West Extension HIA 04/03/2016 PDF icon Kingsburgh West Housing Project_HIA_compressed.pdf
MAPHEPHETHWENI PIPELINE PROJECT 01/02/2016 PDF icon Maphephethweni Pipeline Project_HIA_compressed.pdf
Proposed Dressing Pedestrian Bridge - HIA 01/01/2016 PDF icon Proposed Dressing Pedestrian Bridge_HIA_compressed.pdf
Proposed Mbhele Pedestrian Bridge - HIA 01/01/2016 PDF icon Proposed Mbhele Pedestrian Bridge_HIA_compressed.pdf
Alverstone HIA 01/04/2016 PDF icon Assagay pipeline Heritage report_updated April 2016_compressed.pdf
Construction of Mtwalume Dam, Harry Gwala District Municipality 31/03/2016 PDF icon 10550-20150629-Mtwalume Dam-HIA_updated March 2016_compressed_.pdf
Bayview Social Housing Project 29/06/2016 PDF icon Phase 1 HIA
Madrassa An-Noor HIA 03/08/2016 PDF icon Madrassa An-Noor Facility for the Blind_Expansion_HIA_compressed.pdf
Letter of Exemption for storage and handling of dangerous goods at Ashgate Chemical Logistis Facility 30/09/2016 PDF icon HIA Letter of Exemption_Ashgate Chemical Logistics Facility_Final.pdf
uMkhomazi Water Project - Phase 1 29/02/2016 PDF icon Potable Water Component HIA, PDF icon uMWP-Raw Water Component-Heritage Impact Assessment Sept15.pdf
Ixopo CRU Housing Project 30/09/2016 PDF icon Ixopo Housing Project_HIA_.pdf
Phase 1 HIA Kokstad CRU Housing Project 30/11/2016 PDF icon Kokstad Housing Project_HIA.pdf, PDF icon PIA Report Kokstad housing 24Nov2016rev.pdf
R101 to Moretele Local Municipality South Bulk Water supply system 23/01/2017 PDF icon Magalies Water Moretele South Bulk Water Supply System_Heritage Impact Assessment.pdf, PDF icon 50041-20151203-AD ver 2 - 16012017_PIA.pdf
Upgrade of Mahadeni Vehicular Bridge 22/03/2017 PDF icon Mahadeni Bridge, Ndwedwe LM_HIA.pdf
Revised Burbreeze Pipeline HIA 02/01/2017 PDF icon Revised HIA for the Burbreeze Water Infrastructure Project
Development of Mona Bridge, Ndwedwe 20/03/2017 PDF icon Mona Vehicular Bridge, Ndwedwe_HIA.pdf
Madrassa An-Noor HIA 31/08/2016 PDF icon Madrassa An-Noor - Phase 1 HIA
Proposed upgrade of N2 highway from Lovu River to Umlaas Canal 29/05/2017 PDF icon N2 Upgrade_Umlaas Canal to Lovu River_HIA_V2.pdf
Inanda Glebe HIA 28/04/2017 PDF icon HIA for the proposed Inanda Glebe Sewer Reticulation
Water pipeline project, Hammarsdale 24/05/2017 PDF icon Hammarsdale water pipeline project_HIA-v2.pdf
Musa Special Needs School, Nongoma, KwaZulu-Natal 23/06/2017 PDF icon Phase 1 HIA report, PDF icon Desktop palaeontological study
Ezingolweni Hatchery Project 26/06/2017 PDF icon Phase 1 HIA, PDF icon Desktop Palaeontological Assessment
Upgrade of D1095 road, Ray Nkonyeni Municipality 06/07/2017 PDF icon Phase 1 HIA
Proposed establishment of various borrow pits across northern and southern areas of eThekwini 31/07/2017 PDF icon Northern area sites report, PDF icon Southern area sites report
HIA and PIA for the D489 Bridges and Structures 01/10/2015 PDF icon D489 Structures HIA.pdf, PDF icon PIA - D489 Structures.pdf
Proposed mixed development at Ezakheni D, Alfred Duma Local Municipality 11/09/2017 PDF icon Mixed Development Ezakheni D_Phase 1 HIA.pdf, PDF icon PIA Report Ezahkeni D mixed use 16Sept2017_.pdf
Upgrade and realignment of M30 Umbumbulu Road 28/08/2017 PDF icon Upgrade & realignment of Umbumbulu Mr30 Road_Heritage Impact Assessment.pdf
Desktop Heritage Assessment 07/07/2017 PDF icon Desktop Heritage Assessment
Isondlo Dairy Irrigation Project 15/01/2018 PDF icon Isondlo Dairy Irrigation Project_Phase 1 Heritage Impact Assessment.pdf
Ngwadini Weir and Abstraction Works HIA 01/10/2017 PDF icon Ngwadini Weir and Abstraction Works_HIA_v2.pdf
Kwasobabili DRDLR Irrigation Project 16/01/2018 PDF icon Kwasobabili Heritage Study
Musa Special Needs School Nongoma 29/06/2017 PDF icon Phase 1 HIA, PDF icon Desktop Palaeontological Assessment
Upgrade of Jennings Road 25/10/2017 PDF icon heritage study Upgrade of Jennings Road, Estcourt_Phase 1 HIA.pdf
Use of existing P73 borrow pit HIA 11/09/2017 PDF icon Phase 1 HIA report
Ezingadeni low level bridge, Mondlo 23/10/2017 PDF icon Ezingadeni Low Level Bridge Mondlo_Phase 1 HIA (002).pdf, PDF icon Ezingadeni Low Level Bridge, Mondlo_Phase 1 Palaeo.pdf
GWALA FARM 30/06/2017 PDF icon Proposed Gwala Sewage Infrastructure Project_HIA_v2.pdf
Exemption from Phase 1 HIA Lacey Road housing development 21/05/2018 PDF icon Application for Exemption_Lacey Road housing development.pdf